Car and landing signalling

Lights, arrows, gong and display are not just for comfort: they tell users what the lift is doing and when they can get in.

SODILIFT editorial team · Technical notes for installers · Reading time: 4 min

Car and landing signalling

Four separate functions

  • The call acknowledgement light confirms that the call has been registered.
  • The direction arrow shows on the landing which way the car will leave.
  • The gong announces arrival at the floor. It is the only audible element, and the only one perceived by a visually impaired user.
  • The position display shows which floor the car is on.

What can be replaced on its own, and what cannot

A blown light is replaced without touching anything else. An arrow that does not light up, however, may be caused by the board that drives it rather than the indicator itself: arrow boards from the 64350 family exist in a master version, in red or blue.

If both arrows on the same landing are off, it is rarely because both have failed at the same time.

Consistency across a panel

Signalling is where a partial repair shows most in a building. A blue arrow on the second floor, in a building where all the others are red, gives the repair away.

Before ordering, note the dominant lighting colour and keep it, even if the original reference no longer exists in that colour: it is better to change a whole panel than to leave a mismatched element.

Signalling and accessibility

The gong and the display are not decorative. For a user with poor sight, the audible arrival signal is the only information available at the moment of getting in. A broken gong is repaired, not disconnected.

A reference to confirm, a project to study? Send us photos or drawings: we will reply with a proposal.

WhatsApp Contact

Frequently asked questions

Can I change the lighting colour?

Yes, but on the whole panel at once. An element in another colour is more noticeable than a light that is off.

Is the gong compulsory?

Audible signals are part of the EN 81-70 accessibility requirements for new lifts. On an existing lift, a broken gong should be repaired.

A lift project?

Send us your drawings: we study your project and send you a detailed offer.